Projects
Public Health Engineering
After successfully completion of the first project titled “Planning and Designing of Water Supply for Islamabad” in 1960, the Company won the confidence of clients and was assigned the water supply projects of almost all major cities of Pakistan.
Public Health Engineering
Projects |
Location
|
Cost
Million US$ |
A* | B* | C* | D* | E* | F* | G* | H* |
Shaheed Benazir Bhutto Sweet Water Project for Thar (Umerkot to Keetari) | Pakistan | – | ✓ | ✓ | ||||||
Water Supply and Sewerage Project in Mirpur City (AJK) and Other Hamlets | Pakistan | 49.00 | ✓ | |||||||
Muzaffarabad City Urban Development Project II | AJK | 13.00 | ✓ | ✓ | ||||||
Sustainable Development of the Walled City of Lahore (Package-I) | Pakistan | 25.00 | ✓ | ✓ | ✓ | |||||
Sustainable Development of the Walled City of Lahore (Package – II) | Pakistan | 7.50 | ✓ | |||||||
Drainage Design for Tarbela 4th Extension Hydropower Project | Pakistan | 928.00 | ✓ | ✓ | ||||||
Khadim – e – Punjab Saaf Pani Project (Package – II) | Pakistan | 429.00 | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||
Jabba Dam, Khyber Agency (Design of Water Treatment Plan) | Pakistan | 3.10 | ✓ | ✓ | ||||||
Infrastructure Works of WAPDA Residential Colony for Mohmand Dam Hydropower Project | Pakistan | 1,401.00 | ✓ | ✓ | ||||||
Greater Water Supply Scheme Sehnsa | AJK | 11.01 | ✓ | ✓ | ||||||
NWFP Urban Development Project | Pakistan | 30.00 | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||
5 MGD Water Supply to Nooriabad Estate from Keenjhar Lake | Pakistan | – | ✓ | ✓ | ✓ | |||||
Government Servants Housing Project at Rakh Dhamial, Rawalpindi | Pakistan | 25.00 | ✓ | ✓ | ✓ | |||||
Water Supply, Sewerage, Drainage and Sewage Treatment Plant at Industrial Estate, Attock | Pakistan | 9.33 | ✓ | ✓ | ✓ | ✓ | ||||
Improvement of Water Supply and Sewerage / Drainage System on Shahi Guzargah (Royal Trail Walled City Lahore | Pakistan | 1.62 | ✓ | ✓ | ✓ | |||||
Water Supply and Sewerage Project in Mirpur City and other Hamlets in the Periphery of Mangla Dam | AJK | 70.00 | ✓ | ✓ | ✓ | ✓ | ||||
Augmentation of Water Supply Scheme Kahuta, Rawalpindi | Pakistan | 2.17 | ✓ | ✓ | ✓ | |||||
Punjab Community Water Supply & Sanitation Project | Pakistan | 75.00 | ✓ | ✓ | ✓ | ✓ | ||||
Greater Karachi Water Supply Sewerage & Drainage | Pakistan | 38.00 | ✓ | ✓ | ✓ | ✓ | ✓ | |||
Greater Lahore Water Supply, Sewerage & Drainage | Pakistan | 110.00 | ✓ | ✓ | ✓ | ✓ | ✓ | |||
Greater Faisalabad Water Supply, Sewerage & Drainage | Pakistan | 90.00 | ✓ | ✓ | ✓ | ✓ | ||||
Islamabad Water Supply Scheme | Pakistan | 8.00 | ✓ | ✓ | ✓ | ✓ | ||||
Murree Water Supply Scheme | Pakistan | 3.00 | ✓ | ✓ | ✓ | |||||
Faisalabad Agriculture University Water Supply & Sewerage System | Pakistan | 1.00 | ✓ | ✓ | ✓ | ✓ | ||||
Sindh University Water Supply & Sewerage System | Pakistan | 1.50 | ✓ | ✓ | ✓ | ✓ | ||||
Water Supply, Sewerage, Drainage and Roads, Lahore Cantt. Housing Society | Pakistan | 11.50 | ✓ | ✓ | ||||||
Quetta Water Supply Project | Pakistan | 2.00 | ✓ | ✓ | ✓ | ✓ | ||||
Lahore Urban Drainage Project | Pakistan | 24.00 | ✓ | ✓ | ✓ | ✓ | ||||
Metropolitan Water Supply Project – Bulk Water Supply Phase-III Islamabad (Simly Project | Pakistan | 70.00 | ✓ | ✓ | ✓ | ✓ | ✓ | |||
Augmentation of Water Supply Scheme Murree on Long Term Plan Basis | Pakistan | 6.00 | ✓ | ✓ | ✓ | ✓ | ||||
Extension of Karachi Water Supply Project | Pakistan | 20.80 | ✓ | ✓ | ✓ | |||||
Karachi Storm Water Drainage Project | Pakistan | 25.00 | ✓ | ✓ | ✓ | |||||
Engineering College Taxila Water Supply & Drainage Project | Pakistan | 1.00 | ✓ | |||||||
Industrial Waste Survey | Pakistan | – | ✓ | |||||||
Improvement of Roads, Sewerage & Stormwater Drainage – Sialkot City | Pakistan | 10.00 | ✓ | ✓ | ✓ | ✓ | g | |||
Sialkot Road & Storm Drainage Project Phases-I & II | Pakistan | 4.50 | ✓ | ✓ | ||||||
Karachi-II Water Supply Project | Pakistan | 70.00 | ✓ | ✓ | ||||||
Punjab Rural Water Supply & Sanitation Project | Pakistan | 2.60 | ✓ | |||||||
Water Supply, Sewerage & Drainage of Phase- VI, Defence Housing Authority (DHA), Lahore | Pakistan | 10.42 | ✓ | ✓ | ✓ | |||||
Water Supply, Sewerage & Drainage of Phase-VII Defence Housing Authority (DHA), Lahore | Pakistan | 4.96 | ✓ | ✓ | ✓ | |||||
Muzaffarabad Water Supply Scheme | AJK | 5.00 | ✓ | ✓ | ✓ | ✓ | ||||
Sewerage & Storm Water Drainage Scheme, Muzaffarabad | AJK | 15.00 | ✓ | ✓ | ✓ | ✓ | ✓ | |||
Rawalakot Sewerage & Storm Water Drainage System | AJK | 3.82 | ✓ | ✓ | ✓ | |||||
Storm Water Drainage around Haram Sharif – Makkah | Saudi Arabia | 10.00 | ✓ | ✓ | ||||||
Extension of Mataf and Drainage of Haram Project, Makkah | Saudi Arabia | 40.00 | ✓ | ✓ | ✓ | ✓ | ✓ | |||
Qaisuma & Hafar Al Batin Water Supply Project | Saudi Arabia | 4.00 | ✓ | ✓ | ✓ | ✓ | ✓ | |||
Hafar Al Sudair Water Supply Project | Saudi Arabia | 4.00 | ✓ | ✓ | ✓ | ✓ | ✓ | |||
Flood Drainage around Safa & Haram Sharif | Saudi Arabia | 9.00 | ✓ | ✓ | ✓ | |||||
Soba, Saminika & Zonkwa Water Supply Schemes | Nigeria | 40.00 | ✓ | ✓ | ✓ | |||||
Sokoto Water Supply Extension | Nigeria | 50.00 | ✓ | ✓ | ||||||
Gusau Water Supply Extension | Nigeria | 60.00 | ✓ | ✓ | ✓ | ✓ | ✓ | |||
Lafia Water Supply Scheme | Nigeria | – | ✓ | ✓ | ✓ | ✓ | ✓ | |||
Biu Dam Water Supply Project | Nigeria | – | ✓ | ✓ | ✓ | ✓ | ✓ | |||
Jehaf Water Supply Project | Yemen | 25.00 | ✓ | ✓ | ✓ | ✓ | ✓ | |||
Al-Kharid Dam Project | Yemen | 187.00 | ✓ | ✓ | ✓ | ✓ |
A – Development Planning
B – Survey & Investigations
C – Pre-Feasibility/Feasibility Studies
D – Detailed Design
E – Tender Documents
F – Construction Supervision/Contract Management
G – Management Consultancy
H – Appraisal, Review, Monitoring & Inspections