Projects
Dams and Barrages
Possessing dedicated experience of international standard, ACE has undertaken several consulting assignments in the disciplines of dams & barrages.
Dams and Barrages
Projects |
Location
|
Cost
Million US$ |
A* |
B* |
C* | D* | E* | F* | G* |
H* |
Mangla Dam Raising |
AJK
|
1,070
|
✓ | ✓ | ✓ | |||||
Rehabilitation and Upgradation of Balloki Barrage and LBDC System |
Pakistan
|
215
|
✓ | ✓ | ✓ | |||||
Rehabilitation and Modernization of Jinnah Barrage |
Pakistan
|
155 | ✓ | ✓ | ✓ | |||||
Rawal Dam |
Pakistan
|
4
|
✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||
Hub Dam |
Pakistan
|
200
|
✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||
Khanpur Dam |
Pakistan
|
137
|
✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||
Kalabagh Dam |
Pakistan
|
3200
|
✓ | ✓ | ✓ | ✓ | ||||
Sanjwal Dam |
Pakistan
|
15
|
✓ | ✓ | ||||||
Basha Diamer Dam |
Pakistan
|
4600
|
✓ | ✓ | ||||||
Kurram Tangi Multi-purpose Dam |
Pakistan
|
400
|
✓ | ✓ | ✓ | |||||
Tarbela Dam (Periodic Inspections) |
Pakistan
|
–
|
✓ | |||||||
Chashma Barrage (Periodic Inspections) |
Pakistan
|
–
|
✓ | |||||||
Changoz Dam |
Pakistan
|
4
|
✓ | ✓ | ✓ | |||||
Nariab Dam |
Pakistan
|
4
|
✓ | ✓ | ✓ | |||||
Mangi Dam, Balochistan |
Pakistan
|
93.34 | ✓ | ✓ | ✓ | |||||
Halak Dam, Balochistan |
Pakistan
|
36.88
|
✓ | ✓ | ✓ | |||||
Shadi Kaur Storage Dam, Balochistan |
Pakistan
|
75.36 | ✓ | ✓ | ✓ | ✓ | ||||
Chotiari Dam |
Pakistan
|
64
|
✓ | ✓ | ✓ | ✓ | ||||
Mirani Dam |
Pakistan
|
71
|
✓ | |||||||
Jabba Dam | Pakistan | 3.1 | ✓ | ✓ | ||||||
Toiwar / Batozai Storage Dam | Pakistan | 23.16 | ✓ | ✓ | ||||||
Basol Dam, Omara Gwadar | Pakistan | 91.77 | ✓ | ✓ | ✓ | |||||
Sukkhar Barrage Rehabilitation and Modernization | Pakistan | 154 | ✓ | ✓ | ✓ | ✓ | ||||
Revival of Degraded River Channels in Punjab (Rubber Dam Project) | Pakistan | 20 | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
40 Small Dams, Recharge Dams and Vetting of Designs of 63 Detention Weirs, Sindh | Pakistan | 273.26 | ✓ | ✓ | ✓ | ✓ | ||||
15 Recharge Gabion Dams including Vetting of Design in Nagarparkar Area | Pakistan | ✓ | ||||||||
Replacement of 6 Gates of Sukkar Barrage on Emergency Basis | Pakistan | 5 | ✓ | ✓ | ✓ | |||||
Paya Peda Dam |
Malaysia
|
–
|
✓ | ✓ | ||||||
Timah Tosoh Dam |
Malaysia
|
75
|
✓ | ✓ | ✓ | ✓ | ✓ | |||
Bukit Merah Dam (Reservoir Seepage Study) |
Malaysia
|
12.90
|
✓ | ✓ | ✓ | ✓ | ||||
Muda Dam |
Malaysia
|
–
|
✓ | ✓ | ✓ | |||||
Beris Dam |
Malaysia
|
125
|
✓ | ✓ | ✓ | |||||
Jatiluhur Dam (Remedial Works and Safety Inspection) |
Indonesia
|
14.37
|
✓ | ✓ | ✓ | ✓ | ||||
Tempuran Dam (Rehabilitation Words) |
Indonesia
|
✓ | ✓ | ✓ | ✓ | ✓ | ||||
Goronyo Dam |
Nigeria
|
228
|
✓ | ✓ | ||||||
Biu Dam |
Nigeria
|
740
|
✓ | ✓ | ✓ | ✓ | ✓ | |||
Fune Dam |
Nigeria
|
58.58
|
✓ | ✓ | ✓ | ✓ | ||||
Teesta Barrage |
Bangladesh
|
164
|
✓ | ✓ | ✓ | ✓ | ✓ | |||
Ganges Barrage |
Bangladesh
|
900
|
✓ | ✓ | ✓ | ✓ | ✓ | |||
Hassan Dam, Weirs and Canal System, Delta Abiyan |
Yemen
|
90
|
✓ | ✓ | ✓ | ✓ | ||||
Al-Kharid Dam |
Yemen
|
187
|
✓ | ✓ | ✓ | ✓ | ||||
Surdud Dam |
Yemen
|
122
|
✓ | ✓ | ✓ | ✓ | ||||
Bana Dam, Delta Abiyan |
Yemen
|
95
|
✓ | ✓ | ✓ | ✓ | ||||
Nam Pemg Dam |
Thailand
|
✓ | ✓ | ✓ | ✓ |
A – Development Planning
B – Survey & Investigations
C – Pre-Feasibility/Feasibility Studies
D – Detailed Design
E – Tender Documents
F – Construction Supervision/Contract Management
G – Management Consultancy
H – Appraisal, Review, Monitoring & Inspections