ACE was a member of a joint venture responsible for design and construction supervision of Mangla Dam Raising Project. The project has been completed by raising the Mangla Dam 30ft. Creating an additional storage capacity of 2.9 MAF, and enhancing power generating capacity by about 12%.
Mangla Dam Raising Project-View of Raised Head Walls
Construction of Bridge over River Chenab at Bhaowana including Approaches, Length = 14.63 Km in District Chiniot, Pakistan.
Year of Construction : 2014 – 2015
The Neelum–Jhelum Hydropower Plant is part of a run-of-the-river hydroelectric power scheme in Azad Kashmir
Diamer Basha Dam, proposed to be constructed on river Indus will be 272m high with a storage capacity of 8.1 MAF and power generation capacity of 4,500 MW. This will be the highest roller compacted concrete dam in the world.
Mohmand Dam, being constructed on river Swat, will be 213m high concrete-faced rock filled dam with a power generation capacity of 800 MW and gross storage capacity of 1.29 MAF
The Neelum–Jhelum Hydropower Plant is part of a run-of-the-river hydroelectric power scheme in Azad Kashmir
The Jinnah Barrage is located on the River Indus near Kalabagh, Pakistan. It is part of the Thal Project which helps irrigate 770,000 ha (1,900,000 acres) in the Sindh Sagar Doab east of the Indus
Ghazi Barotha Hydropower Projectcomprising a huge barrage, a 52 km long power channel and a 1,450 MW hydel power station
Ghazi Barotha Hydropower Projectcomprising a huge barrage, a 52 km long power channel and a 1,450 MW hydel power station
Ghazi Barotha Hydropower Projectcomprising a huge barrage, a 52 km long power channel and a 1,450 MW hydel power station
Assembly House of Khyber Pakhtunkhwa, Peshawar which houses the legislative body of the Khyber Pakhtunkhwa province in Pakistan.
Assembly House of Khyber Pakhtunkhwa, Peshawar which houses the legislative body of the Khyber Pakhtunkhwa province in Pakistan.